<?xml version="1.0" encoding="UTF-8" ?>



<rss version="2.0" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#">

<channel>
<title><![CDATA[生活环境无害化处理。清污环保、治污除四害工程]]> </title>
<description>
<![CDATA[物业清洁开荒，建筑外墙清洗，中央空调清洗，排烟管道清理，清理化粪池，机械设备清洗，防水隔热 ，承包驻场清洁，消毒灭蚊杀虫，疏通厕所管道，清挖沙井，白蚁防治 ，清理工业油罐 ，工业污水池 
]]>
</description>
<link>http://hqk338.blog.bokee.net/</link>
<language>zh-cn</language>
<creator>hqk338</creator>
<pubDate>Tue, 16 Jun 2009 10:55:25 CST </pubDate>
<generatorAgent rdf:resource="http://www.bokee.net"/>
<ttl>5</ttl>

<item>
<title>广州下水道疏通、疏通厕所服务！</title>
<link>http://www.bokee.net/blogmodule/weblogcomment_viewEntry/3550255.html</link>
<description>
<![CDATA[]]>
</description>
<guid isPermaLink="false">http://www.bokee.net/blogmodule/weblogcomment_viewEntry/3550255.html</guid>
<subject></subject>
<author>hqk338</author>
<category></category>
<pubDate>Tue, 16 Jun 2009 11:39:51 CST </pubDate>
</item>

<item>
<title>中山防水补漏</title>
<link>http://www.bokee.net/blogmodule/weblogcomment_viewEntry/3232540.html</link>
<description>
<![CDATA[<p>1、管径缘边凿除不良水泥PC楼版&nbsp; <br />2、防水水泥补强&nbsp; <br />3、泄水坡度修正&nbsp; <br />4、防水材施工&nbsp; <br />5、新置高脚落水头 <br />女儿墙压砖工作缝漏水 <br />1、压砖，旧防水水泥补强 <br />2、防水层铺设 <br />3、防水水泥补强 <br />4、增建屋底下漏水，应将增建屋四周防水层塞水路新作 <br />屋顶增建漏水 <br />1、立柱漏水应将柱脚四周旧地面挖至R.C楼版层 <br />2、裂缝修补（以新生铁力钢填缝剂填平） <br />3、增建屋底下漏水，应将增建屋四周防水层塞水路新作 <br />屋顶阳台龟裂漏水 </p>
<p>防水补漏公司 <br />1、清除原有防水层及其覆盖物至原RC楼版层（如施工图） <br />2、压脚砖挖除&nbsp; <br />3、RC楼版面用机器打磨清洁（如施工图） <br />4、垃圾，粉尘清除&nbsp; <br />5、裂缝修补、防水层铺设（新水防水涂料铺设三道）（如施工图） <br />7、乾燥数日后试水 <br />8、覆盖层铺设（如施工图） <br />9、保养及垃圾清运 </p>]]>
</description>
<guid isPermaLink="false">http://www.bokee.net/blogmodule/weblogcomment_viewEntry/3232540.html</guid>
<subject></subject>
<author>hqk338</author>
<category></category>
<pubDate>Tue, 16 Jun 2009 17:29:18 CST </pubDate>
</item>

<item>
<title>广州防水补漏改造</title>
<link>http://www.bokee.net/blogmodule/weblogcomment_viewEntry/3232526.html</link>
<description>
<![CDATA[防水工程：新老屋面防水工程、地下室防水防潮、彩钢板、水池等防水工程。&nbsp;&nbsp;&nbsp;&nbsp; <br />堵漏工程：地下室、顶板裂缝、电梯井、基坑、沉降缝、施工缝、止水带、污水池、地铁、隧道、涵洞、厨卫间、水电站等堵漏工程。&nbsp;&nbsp;&nbsp;&nbsp; <br />渗漏修复工程：屋面，外墙、铝塑门窗、墙板裂缝、玻璃幕墙等渗漏水修复工程。承接：新旧混凝土建筑物的防水补漏工程（楼面裂缝、伸缩缝、沉降缝、连接缝、女儿墙、外墙裂缝、雨蓬、厨房、卫生间、水塔、水池、地下室、电梯井、游泳池）等各项防水补漏与整体防水工程。<br />　　专业的施工工程队，特珠细心的工艺、采用高科技进口的环保补漏村料、无毒无味。随时安排免费勘测现场，并可提供施工方案。施工后如有质量问题，本公司承诺免费修复。施工后按国家规定保修三年。]]>
</description>
<guid isPermaLink="false">http://www.bokee.net/blogmodule/weblogcomment_viewEntry/3232526.html</guid>
<subject></subject>
<author>hqk338</author>
<category></category>
<pubDate>Tue, 16 Jun 2009 17:26:59 CST </pubDate>
</item>

<item>
<title>外墙清洗施工方案</title>
<link>http://www.bokee.net/blogmodule/weblogcomment_viewEntry/3232510.html</link>
<description>
<![CDATA[<span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">高空作业是清洗公司工作的难点，危险性大，但同时又是收入可观的业务项目，一幢高楼，风吹雨打，不清洗是不行的，只有及时做好清洗工作才能避免或减少外墙表面损坏。因此，我们有必要对高空作业、清洗外墙或玻璃幕墙作专门的介绍。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　　　</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /></span><font size="3"><strong><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">一、外墙清洗的方式</span></strong></font><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　目前外墙清洗主要有两种方式：吊板方式和擦窗方式。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　吊板方式是用吊绳、吊板将人吊到工作位置进行清洗。这种声式比较简单，成本也低，只要工人身体素质好、绳子连接牢固就可以进行，一般的大楼都可以用这种方式进行清洗，但是这种方式的操作必须使安全措施到位，否则危险性很大，造成伤亡事故的都是因安全措施不到位造成的。根据不同建筑结构与墙面材质，针对污垢与物体表面结合力，选用专业外墙清洗剂和玻璃清洁剂，使用吊篮或吊绳，采用包括高压水枪、清洗机等设备进行施工操作。<span style="FONT-SIZE: 10pt; COLOR: black"><br /></span></span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　<strong>二、外墙清洗的条件</strong></span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">1</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、气候条件：外墙清洗必须要在良好的气候条件下进行，风力应小于</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">4</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">级，</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">4</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">级以上停止工作。因此，工作前应测定风力，尤其是高空风力。另外，下雨、下雪、有雾、能见度差以及高温（</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">35</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">℃以上）和低温</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">(0</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">℃以下</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">)</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">等条件下都不适合进行外墙清洗。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">2</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">．人员条件：为了贯彻执行国家安全法规，确保工人人身安全及设备正常运转，规定：高空操作者必须是年满</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">18</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">周岁的男性公民，并经过身体检查和安全技术培训，经考试合格方可作业，工人上岗前不得饮酒，有感冒等身体不适症状就暂停高空作业。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">3</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、设备条件：外墙清洗的设备必须处于良好的工作状态，凡吊板有发毛、部分绳股渐裂等现象应立即更换新绳。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><strong><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　三、</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">安全操作规程</span></strong><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">l</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、上班前必须认真检查机械设备、用具、绳子、坐板、安全带有无损坏，确保机械性能良好及各种用具无异常现象方能上岗操作。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">2</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、操作绳、安全绳必须分开生根并扎紧系死，靠沿口处要加垫软物，防止因磨损而断绳，绳子下端一定要接触地面，放绳人同时也要系临时安全绳。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">3</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、施工员上岗前要穿好工作服，戴好安全帽，上岗时要先系安全带，再系保险锁（安全绳上），尔后再系好卸扣</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">(</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">操作绳上</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">)</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">，</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">同时坐板扣子要打紧，固死。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">4</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、下绳时，施工负责人和楼上监护人员要给予指挥和帮助。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">5</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、操作时辅助用具要扎紧扎牢．以防坠伤人，同时严禁嘻笑打闹和携带其它无关物品；</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">6</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、楼上、地面监护人员要坚守在施工现场．切实履行职责．随时观察操作绳、安全绳的松紧及绞绳、串绳等现象，发现问题及时报告，及时排除。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">7</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、楼上监护人员不得随意在楼顶边沿上来回走动。需要时，必须先系好自身安全绳，尔后再进行辅助工作。地面监护人员不得在施工现场看书看报，更不得随意观赏其它场景。并要随时制止行人进入危险地段及拉绳、甩绳现象发生。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">8</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、操作绳、安全绳需移位、上下时，监护人员及辅助工人要一同协调安置好，不用时需把绳子打好捆紧。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">9</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、施工员要落地时，要先察看一下地面、墙壁的设施，操作绳、安全绳的定位及行人流量的多少情况，待地面监护人员处理、调整，同意后方可缓慢下降，直至地面。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">10</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、要坚持安全第一、文明施工，确保工程服务质量。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">11</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、不准乱拿甲方或客户的物品，不得损坏甲方或客户的各种设施。</span><span style="FONT-SIZE: 10pt; COLOR: black"><br /><br /></span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">　　</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">12</span><span style="FONT-SIZE: 10pt; COLOR: black; LETTER-SPACING: 0pt">、高空作业人员和现场监护人员必须服从施工负责人的统一指挥和统一管理。</span>]]>
</description>
<guid isPermaLink="false">http://www.bokee.net/blogmodule/weblogcomment_viewEntry/3232510.html</guid>
<subject></subject>
<author>hqk338</author>
<category></category>
<pubDate>Tue, 16 Jun 2009 17:24:11 CST </pubDate>
</item>

<item>
<title>广州下水道疏通、疏通厕所服务！</title>
<link>http://www.bokee.net/blogmodule/weblogcomment_viewEntry/3229555.html</link>
<description>
<![CDATA[清理理化粪池、专车吸粪主要指化粪池、厕所（尤其是无市政管网的老城区，小胡同的厕所粪便）通过专用粪便清运车辆，抽运至粪便消纳处理站，集中进行无害化处理的作业过程。多年来，公司承担着城区及其周遍地区众多宾馆饭店、写字楼、机关、学校、物业公司等化粪池、隔油池、 污水井清掏、抽运，人工掏挖化粪池、隔油池、污水井，（清井底）污水的清运工作。丰富的工作实践与不断的科技创新使逐步形成了一支具有专业化、规范化运输实力的清运团队。我们一贯坚持以周到、热情的工作态度为社会各界提供最优质的服务。本公司专业承接专车吸粪、清理化粪池 、隔油池、地毯清洗、广州管道疏通，疏通排污管道、广州下水道疏通、疏通厕所服务！]]>
</description>
<guid isPermaLink="false">http://www.bokee.net/blogmodule/weblogcomment_viewEntry/3229555.html</guid>
<subject></subject>
<author>hqk338</author>
<category></category>
<pubDate>Tue, 16 Jun 2009 11:39:51 CST </pubDate>
</item>

</channel>
</rss>
